Construction Projects

dynamic message sign icon

20/26 Casper - Moneta (mp 68.35 - 74.5)

Project Number: SCP-TC-N342044

WYDOT Contact: Kaia Tharp, phone: 307-864-3200, email: null

Contractor: McGarvin-Moberly Construction Co., Worland, WY, 307-347-4268

Scheduled Completion Date: 2017-Aug-31

Crushed base and bitumitous pavement surfacing; chip seal and misc work.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US2068.35 to 74.5PavedNone

Last Updated: 2017-06-06 15:15:37.959

dynamic message sign icon

Basin - Greybull

Project Number: 4

WYDOT Contact: Travis Jorgenson, phone: 272-5505, email: null

Scheduled Completion Date: 2017-Jun-21

Maintenance chip seal operation on HWY 16/20/789 between Basin and Greybull from milepost 197.65 to milepost 203.39. Flagger operation. Expect 20 minute traffic delays.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US20197.65 to 203.39Paved
20 minute delays with stopped conditions

Last Updated: 2017-06-20 12:10:16.495

dynamic message sign icon

Burgess South Section (US 14 mp 37.98-57.27)

Project Number: N372005

WYDOT Contact: Jerry Buckley, phone: 307-674-2326, email: jerry.buckley@wyo.gov

Contractor: Wilson Bros. Construction, Inc., Cowley, WY, 307-548-6559

Scheduled Completion Date: 2017-Oct-31

Grading, milling plant mix, placing crushed base, bituminous pavement surfacing, plant mix wearing course, full depth reclamation, electrical and misc work on approximately 11 miles on US 14.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US1437.98 to 57.27Paved, Gravel
Various delay conditions

Last Updated: 2017-06-23 07:21:12.553

dynamic message sign icon

CY Ave (Wyoming 220 mp 110.85-113.10)

Project Number: N212110

WYDOT Contact: Jack Stone, phone: 307-473-3227, email: jack.stone@wyo.gov

Contractor: Knife River - Casper, Casper, WY, 307-237-9346

Scheduled Completion Date: 2017-Jun-30

Grading, draining, crushed base, plant mix surfacing, plant mix wearing course, curb and gutter, traffic signal systems and miscellaneous work. Speed limit reduced to 30 mph. 20 minute delays possible.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY220110.85 to 113.1Paved
20 minute delays with stopped conditions
Construction zone speed limit 30 MPH

Last Updated: 2017-04-06 10:54:11.493

dynamic message sign icon

Casper Streets (WY Blvd and 12th St. Intersection)

Project Number: AML17-W258023 & ARSCT-W258A02

WYDOT Contact: Chad Aagard, phone: 473-3225, email: chad.aagard@wyo.gov

Contractor: Hedquist Construction Inc., Casper, WY, 307-237-8543

Scheduled Completion Date: 2017-Oct-31

MP 16.79 to 17.02 Paved with 5 lanes reduced to 2 lanes and reduced speeds. 12th Street closed between Wyoming Blvd and Stafford.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY25816.79 to 17.02PavedNone

Last Updated: 2017-06-21 15:39:40.272

dynamic message sign icon

Cheyenne-Nebraska State Line (Pine Bluffs Marginal - EBL)

Project Number: NHPPI-I806199

WYDOT Contact: Kevin Erickson, phone: null, email: kevin.erickson@wyo.gov

Contractor: SEMA Construction, Inc., Centennial, CO, 303-627-2600

Scheduled Completion Date: 2018-Aug-31

Grading, draining, milling plant mix and concrete, placing crushed base and bituminous pavement surfacing, plant mix wearing course, bridge replacements, electrical and miscellaneous work on 2.18 miles on I-80 beginning at RM 400.58 between Cheyenne and the Nebraska State Line at Pine Bluffs. Currently there is a 14' width restriction for I-80 East & West bound between RM 400.58 to RM 402.7. Closure of I-80 eastbound lanes will begin April 2nd. Westbound traffic will be reduced to single lane and all eastbound traffic will be redirected to the other westbound lane. Travel will be single lane head to head located on the westbound lanes.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I80400.58 to 402.78Paved
Various delay conditions

Last Updated: 2017-06-21 15:33:48.720

dynamic message sign icon

Chief Joseph Scenic Highway (Paint Creek Canyon & Two Dot Sections)

Project Number: SCP-TC-1507036

WYDOT Contact: Todd Frost, phone: 307-587-2220, email: todd.frost@wyo.gov

Contractor: Oftedal Construction, Inc., Miles City, MT, 406-232-5911

Scheduled Completion Date: 2017-Jun-30

Grading, milling plant mix, placing crushed base and bituminous pavement surfacing, chip seal, bridge deck repair and miscellaneous work on 13.32 miles on WYO 296 beginning at RM 46.20 on Chief Joseph Scenic Highway. Chip seal operation in progress. Expect up to 20 minutes delays. Traffic to be controlled by pilot car and flaggers.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY29632.88 to 46.2Paved
20 minute delays with stopped conditions
Various delay conditions

Last Updated: 2017-06-21 15:49:04.587

dynamic message sign icon

Contract Patching Project

Project Number: STP-PM- B171008 & CMP-PM- B171029

WYDOT Contact: Kevin Erickson, phone: null, email: kevin.erickson@wyo.gov

Contractor: Knife River, Cheyenne, WY, 307-634-5455

Scheduled Completion Date: 2017-Oct-31

Milling plant mix and concrete, placing pit run subbase,crushed base and bituminous pavement surfacing and misc. work on 6.17 miles at various locations in Transportation District 1. I80 Eastbound between milepost 377.74 and milepost 380.00 US85 between milepost 0.00 and milepost 3.91

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I80377.74 to 380.0PavedNone
US850.0 to 3.91PavedNone

Last Updated: 2017-06-14 14:17:58.238

dynamic message sign icon

Daniel Jct. - Hoback Jct. (Rim North Section)

Project Number: SCP-TC-N132104

WYDOT Contact: Dan McGillivray, phone: 307-367-4488, email: null

Contractor: McGarvin-Moberly Construction Co., Worland, WY, 307-347-4268

Scheduled Completion Date: 2017-Oct-31

Grading, milling plant mix, placing crushed base, bituminous pavement surfacing, reclaimed asphalt pavement widening and miscellaneous work on 7.72 miles on US 189 beginning at RM 136.37 between Daniel Jct and Hoback Jct.Delays up to 20 minutes. A stoplight will be in use for slide repairs, estimating this will begin the week of June 5. There will be unsurfaced sections of roadway during the slide repairs.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US189128.65 to 136.37Paved
20 minute delays with stopped conditions

Last Updated: 2017-06-01 09:54:20.911

dynamic message sign icon

District 1 Guardrail Upgrade

Project Number: HSIP-SEP B161020

WYDOT Contact: Jake Lonn, phone: 307-328-4103, email: jake.lonn@wyo.gov

Scheduled Completion Date: 2017-Oct-31

S&L Industrial: Guardrail upgrades, bridge rehabilitation and miscellaneous work at various locations. Some of the locations will have width restrictions while they are under construction.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US30235.23 to 328.48PavedNone
WY700.0 to 57.7PavedNone
WY7890.0 to 53.223PavedNone

Last Updated: 2017-06-22 13:06:43.312

dynamic message sign icon

District 1 Sign Upgrades

Project Number: HSIP I803149

WYDOT Contact: Jake Lonn, phone: 307-328-4103, email: jake.lonn@wyo.gov

Scheduled Completion Date: 2017-Jun-30

S&L Industrial: Upgrading signs on I80 at various locations

Last Updated: 2017-06-22 13:11:25.592

dynamic message sign icon

District 1 Sign Upgrades

Project Number: HSIP I803149

WYDOT Contact: Jake Lonn, phone: 307-328-4103, email: jake.lonn@wyo.gov

Scheduled Completion Date: 2017-Jun-30

S&L Industrial: Upgrading signs on I80 at various locations

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I80187.2 to 402.78PavedNone

Last Updated: 2017-06-22 13:11:49.185

dynamic message sign icon

District 1 Slab Repair

Project Number: AML17-PM- B171009

WYDOT Contact: Kevin Erickson, phone: null, email: kevin.erickson@wyo.gov

Contractor: Simon Contractors and Subsidiaries, Cheyenne, WY, 307-632-7900

Scheduled Completion Date: 2017-Oct-31

Placing crushed base, removal and replacement of concrete slabs and miscellaneous work at the following locations: I80 Eastbound Lane at milepost 357.69 to 361.78 WYO212 at milepost 6.88 to 7.15 US30 at milepost 361.54 to 363.19 14 ft width restriction in place on I-80 between RM 357.69 to RM 361.78, east bound direction. Slab Repair in Various locations will be replacing 10" Concrete & 14" crushed base.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I80357.69 to 361.78Paved
Various delay conditions
US30361.54 to 363.19Paved
Various delay conditions
WY2126.88 to 7.15Paved
Various delay conditions

Last Updated: 2017-06-14 11:34:44.166

dynamic message sign icon

District IV Bridge Rehab

Project Number: B174018

WYDOT Contact: Joshua Jundt, phone: 307-682-3550, email: josh.jundt@wyo.gov

Contractor: S & S Builders, LLC, Gillette, WY, 307-686-5659

Scheduled Completion Date: 2017-Aug-04

Bridge Rehabilitation work includes deck and joint repairs. Expect single lane traffic, controlled by signals. Bridge over the Belle Fourche River in the town of Hulett. 10' Width Restriction in effect.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY2415.48 to 15.48Paved
Various delay conditions

Last Updated: 2017-06-12 12:59:45.233

dynamic message sign icon

Diversion Dam Jct . - Riverton (Wind River Section)

Project Number: SCP-TC-N303043

WYDOT Contact: Robert Scheidemantel, phone: 856-1341; 851-3605, email: null

Contractor: High Country Construction, Inc., Lander, WY, 307-332-4933

Scheduled Completion Date: 2017-Jun-30

Grading, draining, milling plant mix, placing crushed base and bituminous pavement surfacing, chip seal, bridge rehabilitation, fencing and miscellaneous work on 5.062 miles on US 26 beginning at RM 99.62 between Dubois and Riverton. A 12' wide width restriction went into effect on 4/11/2016. A pilot car with single lane traffic is in use. Bridge work work has been completed and traffic signal has been removed. Contractor will be chip sealing Friday and The beginning of next week. Delays on the roadway will be up to 15 minutes with pilot car.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US2699.62 to 104.0Paved
Construction zone speed limit 45 MPH
Various delay conditions
15 minute delays with stopped conditions

Last Updated: 2017-06-21 15:51:47.919

dynamic message sign icon

East of Dubois at East Fork Turning Lane

Project Number: 1

WYDOT Contact: Kim Kurasz, phone: 307-455-2434, email: null

Scheduled Completion Date: 2017-Jun-22

Maintenance paving operation East of Dubois at East Fork Turning Lane on HWY 26 between mileposts 65.77 and 66. Flagger Operation. Expect 15 minute traffic delays.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US2665.77 to 66.0Paved
15 minute delays with stopped conditions

Last Updated: 2017-06-21 09:17:57.003

dynamic message sign icon

Greybull - Burgess Jct (Chip Seal Operation)

Project Number: 10

WYDOT Contact: Travis Jorgenson, phone: 272-5505, email: null

Scheduled Completion Date: 2017-Jun-26

Maintenance chip seal operation on HWY 14 between Greybull and Burgess Jct, from milepost 19.64 to milepost 26. Flagger operation. Expect 20 minute traffic delays.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US1419.64 to 26.0Paved
20 minute delays with stopped conditions

Last Updated: 2017-06-21 10:49:01.404

dynamic message sign icon

Hoback River Bridge.(CR33)

Project Number: OC22031

WYDOT Contact: Bob Hammond, phone: 307-733-3665, email: bob.hammond@wyo.gov

Contractor: Cannon Builders, Inc., Blackfoot, ID, 208-785-6281

Scheduled Completion Date: 2017-Oct-31

The Wyoming Department of Transportation, with contract crews from Cannon Builders Inc., are initiating work in the Hoback Junction with the replacement of the bridge over the Hoback River at milepost 0.078 on Teton County Road 33, also known as Hoback Junction South Road. Residents will see crews and equipment mobilizing to place a temporary, single-lane bridge downstream and adjacent to the current bridge. After traffic is moved to the temporary bridge, work will then begin on the new bridge. Delays will be used as needed and crews will do their best to keep them to 15 minutes or less. Drivers are reminded to plan accordingly for potential delays.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
Teton Co: Hoback Junction South Road0.0 to 0.4Dirt
15 minute delays

Last Updated: 2017-06-13 11:31:42.174

dynamic message sign icon

I-80 County Line East 341.20-348.37

Project Number: NHPPI_I806206

WYDOT Contact: Kevin Erickson, phone: null, email: kevin.erickson@wyo.gov

Contractor: Knife River, Cheyenne, WY, 307-634-5455

Scheduled Completion Date: 2017-Oct-31

Grading, milling plant mix, bituminous pavement surfacing, plant mix wearing course, bridge rehabilitation, lane rental and miscellaneous work on 7.172 miles on I-80 beginning at RM 341.20 between Laramie and Cheyenne.Work has started on I-80 Eastbound Structures between RM 341.2 - 348.37. Expect some areas to be limited to 1 lane of travel - no time delays are expected. A 14' Oversize Restriction is in place starting 5/22/17.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I80341.2 to 348.37PavedNone

Last Updated: 2017-05-25 16:00:15.171

dynamic message sign icon

I-90 Piney Creek Interchange - Story (County Line)

Project Number: STP-1003014 & ARSCT-1003A01

WYDOT Contact: Isaac Finkle, phone: 307.684.2505, email: null

Contractor: Reiman Corp. and Subsidiary, Cheyenne, WY, 307-632-8971

Scheduled Completion Date: 2017-Oct-31

Grading, draining, milling plant mix, placing crushed and blended base, bituminous pavement surfacing, chip seal, removal and replacement of structures and miscellaneous work on 6.35 miles on WYO 193 beginning at RM 97.98 at the I-90 Piney Creek Interchange. Paved detour in place Milepost 99.62 with speed reduced to 30 mph.. Speed is reduced to 20 mph at Milepost 100.13 for new bridge construction. Single lane closures throughout project limits controlled with flaggers and pilot cars. Expect delays.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY19398.28 to 104.0Paved
10 minute delays with stopped conditions
Construction zone speed limit 30 MPH

Last Updated: 2017-06-13 16:29:16.898

dynamic message sign icon

I80 MP 359.08

Project Number: B171010

WYDOT Contact: Wayne Shenefelt, phone: 307-630-8462, email: null

Contractor: S & S Builders, LLC, Gillette, WY, 307-686-5659

Scheduled Completion Date: 2017-Oct-31

Grading,placing crushed base, concrete slab replacement, bridge rehabilitation, electrical and miscellaneous work at various locations in Transportation District 1. Eastbound Passing Lane is now closed between MP 358.5 to MP 359.29. Exit 8B West from North and South on I-25 is closed. There are now detours at Exit 9 North and South on I-25.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I80359.08 to 359.08Paved
Various delay conditions

Last Updated: 2017-06-21 15:34:33.176

dynamic message sign icon

I80 MP 362 - 372.4

Project Number: I806205

WYDOT Contact: Wayne Shenefelt, phone: 307-630-8462, email: null

Contractor: Mountain Construction Company, Lovell, WY, 307-548-7186

Scheduled Completion Date: 2017-Oct-31

Grading, milling plant mix, plant mix wearing course, bridge rehabilitation and miscellaneous work with A+B bidding on 10.48 miles on I-80 EBL beginning at RM 362 at various location between Cheyenne and Pine Bluffs.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I80362.0 to 372.4PavedNone

Last Updated: 2017-06-07 11:56:04.141

dynamic message sign icon

I80 WB MP 186.62 - 199.05

Project Number: NPHHI-I803145

WYDOT Contact: Aaron Spenny, phone: 307-328-4100, email: null

Contractor: Lewis & Lewis Inc., Rock Springs, WY, 307-362-7948

Scheduled Completion Date: 2017-Oct-31

WYDOT has a project, between Rawlins and Rock Springs, from RM 188.62 to RM 199.05 along I-80. Traffic will be switched from the Westbound lane to head-to-head in the Eastbound lane. Speed limit will be 65MPH through the entire project section.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I80188.62 to 199.05Paved
Various delay conditions
Construction zone speed limit 65 MPH

Last Updated: 2017-06-15 11:08:07.648

dynamic message sign icon

Kemmerer -Hams fork, Hams fork North/South section (WY 233)

Project Number: 1202028/1202029

WYDOT Contact: Jennifer Hoffman, phone: 307-679-4811, email: jennifer.hoffman@wyo.gov

Contractor: Knife River, Cheyenne, WY, 307-634-5455

Scheduled Completion Date: 2017-Oct-31

Full depth reclamation and double inverted chip seal with new guardrail installation. Traffic will be stopped with flaggers during the day beginning May 1 until August 31.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY2331.95 to 19.68Paved, Grooved
Various delay conditions

Last Updated: 2017-04-16 09:10:52.072

dynamic message sign icon

Laramie - Rawlins (Walcott EBL 233.76-240)

Project Number: NHPPI-I804256

WYDOT Contact: Jake Lonn, phone: 307-328-4103, email: jake.lonn@wyo.gov

Contractor: HK Contractors, Inc., Idaho Falls, ID, 208-523-6600

Scheduled Completion Date: 2017-Oct-15

Grading, milling plant mix and concrete, bituminous pavement surfacing, plant mix wearing course, crack and seal concrete pavement, structure deck rehabilitation and miscellaneous work. One lane day time closures expected through Sept 30. The Eastbound lane will be closed and the Westbound lane will have 2 way traffic throughout the length of project.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I80233.76 to 240.0Paved
Various delay conditions

Last Updated: 2017-06-15 11:13:40.598

dynamic message sign icon

Laramie Streets - UPRR Overpass Section

Project Number: NHPP-0261020, NHPP-E-P261033 & ARSCT-0261A01

WYDOT Contact: Steven Cook, phone: 307-745-2115, email: steve.cook@wyo.gov

Contractor: S & S Builders, LLC, Gillette, WY, 307-686-5659

Scheduled Completion Date: 2019-Jul-31

Grading, draining, milling plant mix, placing crushed base and bituminous pavement surfacing, plant mix wearing course, concrete pavement, sidewalk, curb and gutter, replacement of a structure with widening of a structure, water systems, electrical, landscaping and miscellaneous work. Snowy Range Road is closed from Cedar St to Garfield St and traffic is being detoured on Garfield St and Cedar St. 12' width restriction in place.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY1300.5 to 0.8PavedNone

Last Updated: 2017-05-23 13:26:51.323

dynamic message sign icon

Lazeart Jct -Kemmerer, Cumberland South Section (US 189 MP 18.4 - MP 24)

Project Number: P111012

WYDOT Contact: Jennifer Hoffman, phone: 307-679-4811, email: jennifer.hoffman@wyo.gov

Contractor: Kilgore Companies, LLC and Sub., Magna, UT, 801-250-0132

Scheduled Completion Date: 2017-Oct-31

Driving surface is a fully paved surface. Bridge work begins on 6/26/17. Expect up to 10 minute delays 24 hours a day until bridge work is finished (estimated at July 7th).

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US18918.4 to 24.0Paved
10 minute delays

Last Updated: 2017-06-21 15:41:18.691

dynamic message sign icon

Lowery Section

Project Number: 1903098

WYDOT Contact: Joshua Jundt, phone: 307-682-3550, email: josh.jundt@wyo.gov

Contractor: Croell Ready Mix, Sundance, WY, 307-283-2221

Scheduled Completion Date: 2017-Oct-31

Mill and overlay with bridge rehabilitation work. Expect single lane traffic in both directions with a speed reduction.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I90106.0 to 112.0Paved
Various delay conditions

Last Updated: 2017-06-06 08:20:40.962

dynamic message sign icon

Lyman-Granger (Lyman East)

Project Number: NHPPI-I801181

WYDOT Contact: Damon Newsome, phone: 307-789-3363, email: null

Contractor: Lewis & Lewis Inc., Rock Springs, WY, 307-362-7948

Scheduled Completion Date: 2017-Nov-30

Beginning March 20th, road work on I-80 (EBL and WBL) from mile post 39.21 to 49.06. 15' head to head traffic speed limit 65 mph

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I8039.21 to 49.06PavedNone

Last Updated: 2017-06-21 04:56:26.296

dynamic message sign icon

Muddy Gap - Lander (Sweetwater Section)

Project Number: SCP-TC-N202068

WYDOT Contact: Erik Smith, phone: 307-332-4151, email: erik.smith@wyo.gov

Contractor: Hedquist Construction Inc., Casper, WY, 307-237-8543

Scheduled Completion Date: 2017-Oct-31

Grading, milling plant mix, placing pit run sub-base and bituminous pavement surfacing, chip seal and miscellaneous work 5.98 miles on US 287 beginning at RM 41.14 to 47.12 between Lander and Muddy Gap. 12 FT Width Restriction beginning June 12th, 2017 for MP 41.14 to 47.12.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US28741.14 to 47.12Paved
15 minute delays

Last Updated: 2017-06-13 16:35:08.084

dynamic message sign icon

Muddy Gap to Casper

Project Number: N212119

WYDOT Contact: Chad Aagard, phone: 473-3225, email: chad.aagard@wyo.gov

Contractor: Oftedal Construction, Inc., Miles City, MT, 406-232-5911

Scheduled Completion Date: 2017-Oct-31

Guardrail Upgrade on WY220 between MP 81 and MP 86. Passing lane closed. Reduced speed limit. No stops. Surface is paved with shoulder work. No delays.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY22081.0 to 86.0PavedNone

Last Updated: 2017-06-21 15:37:35.222

dynamic message sign icon

Powell Streets. Coulter Ave/US 14A

Project Number: STPUD-PO 23.88N291063 & NHPP23.88 N291064

WYDOT Contact: Todd Frost, phone: 307-587-2220, email: todd.frost@wyo.gov

Contractor: Century Companies, Inc. and , Lewistown, MT, 406-535-1200

Scheduled Completion Date: 2017-Oct-31

Grading, milling, plant mix, placing crushed base and bituminous pavement surfacing, plant mix wearing course, concrete pavement, electrical and miscellaneous work on 1.26 miles on Coulter Ave (US 14 A in Powell). Two way traffic, various lane closures, reduced speed to 20 mph. Chip Sealing in progress.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US14 Alternate23.85 to 25.03Paved
Construction zone speed limit 20 MPH

Last Updated: 2017-06-21 15:48:01.889

dynamic message sign icon

Rock Springs - Pinedale (Trapper Lane Bike Path & Boulder Section) MP 81 to 88.23

Project Number: SCP-TC-N132102

WYDOT Contact: Dan McGillivray, phone: 307-367-4488, email: null

Contractor: HK Contractors, Inc., Idaho Falls, ID, 208-523-6600

Scheduled Completion Date: 2017-Oct-31

Grading, milling plant mix, placing crushed base and bituminous pavement surfacing, reclaimed asphalt pavement widening, bridge deck repair and miscellaneous work on 9.78 miles on US 191 at various locations between Rock Springs and Pinedale. Traffic lights are estimated to be in use the week of 06/05/17. Flagging operations and a pilot car can also be expected. Delays of less than 15 minutes. Pinedale Unit 326 Called the TMC to update the road surface to milled. BLH

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US19181.0 to 88.23Paved
15 minute delays with stopped conditions

Last Updated: 2017-06-05 09:53:39.776

dynamic message sign icon

Rock Springs - Pinedale (Trapper Lane Bike Path & Boulder Section) MP 94.75 to 97.28

Project Number: SCP-TC-N132105

WYDOT Contact: Dan McGillivray, phone: 307-367-4488, email: null

Contractor: HK Contractors, Inc., Idaho Falls, ID, 208-523-6600

Scheduled Completion Date: 2017-Oct-31

Grading, milling plant mix, placing crushed base and bituminous pavement surfacing, reclaimed asphalt pavement widening, bridge deck repair and miscellaneous work on 9.78 miles on US 191 at various locations between Rock Springs and Pinedale. Minimal delays. Reduced speed due to shoulder work.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US19194.75 to 97.28PavedNone

Last Updated: 2017-06-01 11:09:16.487

dynamic message sign icon

Sage Creek - Kemmerer, Tunnel Hill Section (US 30 mp 45.7-52.7)

Project Number: N121110

WYDOT Contact: Jennifer Hoffman, phone: 307-679-4811, email: jennifer.hoffman@wyo.gov

Contractor: Kilgore Companies, LLC and Sub., Magna, UT, 801-250-0132

Scheduled Completion Date: 2017-Oct-31

Mill and overlay. Traffic will be stopped with flaggers during the day. Driving surface is a paved surface. Short delays (5 minutes) will be encountered as bridge work starts.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US3045.7 to 52.49Paved, Grooved
Various delay conditions

Last Updated: 2017-06-14 12:20:21.346

dynamic message sign icon

Sheridan Marginal (North Sheridan Interchange)

Project Number: SIB-NHPPI-0901091

WYDOT Contact: Jerry Buckley, phone: 307-674-2326, email: jerry.buckley@wyo.gov

Contractor: Reiman Corp. and Subsidiary, Cheyenne, WY, 307-632-8971

Scheduled Completion Date: 2019-Oct-31

Construction on 5.81 miles on various roads in Sheridan. Contractor working on structures. New I-90 Interchange, Goose Creek Bridge WYO 338 and I-90 Railroad structures. Building new roadways. Installing storm sewer and water system. paving on lowering of I-90. 12' width restriction in place through the project. Head to head on the EBL Traffic control in place through out the project.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I9021.65 to 22.47Paved
Various delay conditions
Construction zone speed limit 45 MPH

Last Updated: 2017-06-21 15:45:49.809

dynamic message sign icon

Snake River North

Project Number: N104083

WYDOT Contact: Bob Hammond, phone: 307-732-9602, email: null

Contractor: Wadsworth Brothers Construction Co., Draper, UT, 801-576-1453

Scheduled Completion Date: 2019-Jun-30

Grading, draining, milling plant mix, removal and replacement of structures, concrete box culverts, placing crushed base and bituminous pavement surfacing, plant mix wearing course, electrical and sewer systems, and miscellaneous

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US89144.99 to 148.7PavedNone

Last Updated: 2017-05-18 15:38:50.982

dynamic message sign icon

Spur West

Project Number: N471002

WYDOT Contact: Jack Stone, phone: 307-473-3227, email: jack.stone@wyo.gov

Contractor: Hedquist Construction Inc., Casper, WY, 307-237-8543

Scheduled Completion Date: 2017-Jun-30

Grading, draining, milling plant mix, placing crushed base, bituminous pavement surfacing, plant mix wearing course, concrete pavement, bridge rehabilitation, removal and replacement of guardrail and miscellaneous work.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US26 Bypass0.13 to 1.2PavedNone

Last Updated: 2017-05-24 00:21:34.230

dynamic message sign icon

Sundance - SD Line Slab Replacement

Project Number: I904137

WYDOT Contact: Warren Oyler, phone: 307-283-1135, email: warren.oyler@wyo.gov

Contractor: S & S Builders, LLC, Gillette, WY, 307-686-5659

Scheduled Completion Date: 2017-Oct-31

Grading, placing crushed base and bituminous pavement surfacing, concrete slab replacement, electrical and misc work on 5.13 miles on I-90 beginning at RM 202.01 between Sundance and the South Dakota State Line. A two mile lane closure exists in the east bound direction, from approximate RM 205 to RM 207. Speeds may be reduced to 45 mph for part of the lane closure, and 65 mph for the remainder.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I90202.01 to 207.14Paved
Various delay conditions
Construction zone speed limit 45 MPH

Last Updated: 2017-06-21 15:43:22.078

dynamic message sign icon

Sundance West (Rupe Hill Slide)

Project Number: STP-DR41319

WYDOT Contact: Warren Oyler, phone: 307-283-1135, email: warren.oyler@wyo.gov

Contractor: DRM, Inc., Gillette, WY, 307-682-0328

Scheduled Completion Date: 2017-Oct-31

Grading, draining, milling plant mix, placing crushed base and bituminous pavement surfacing, chip seal and miscellaneous work on 1.39 miles on US 14 west of Sundance at RM 196.96. Expect speed reductions of 30 mph, and trucks entering the highway. Short sections of milled pavement surfaces may be encountered, with loose gravel and reduced speeds. Occasional delays of 10 minutes. There is an 1/4 mile long two lane detour at RM 197 with loose gravel and a rough surface, but passable in a car. Pilot car operations have temporarily ceased.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US14196.96 to 198.35Gravel
10 minute delays
Construction zone speed limit 30 MPH

Last Updated: 2017-06-14 12:26:47.408

dynamic message sign icon

WY 230 Woods Landing - CO (mp 33.04-42.04)

Project Number: SCP-TC-P261027

WYDOT Contact: Steve Cook, phone: 307-760-2595, email: null

Contractor: McGarvin-Moberly Construction Co., Worland, WY, 307-347-4268

Scheduled Completion Date: 2017-Oct-31

Pavement overlay and bridge work. 14 foot width restriction in place through the construction zone. One lane bridge (MP 41.38) controlled by traffic signals. Expect 2 min delay.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY23033.04 to 42.04Paved
Various delay conditions

Last Updated: 2017-05-07 08:07:53.802

dynamic message sign icon

WY 59 north of Douglas mp 7.1 - 34.7

Project Number: AML-B172022

WYDOT Contact: Jim Barnes, phone: 307-331-1535, email: james.barnes@wyo.gov

Scheduled Completion Date: 2017-Oct-31

Grading, draining, milling of plant mix and concrete, crushed base, bituminous pavement surfacing and miscellaneous work on WYO 59 between Douglas and Bill. Construction is ongoing between R.M. 7.1 and 34.7. Traffic will be restricted to one lane at only one location at a time. At the other locations, work will be done under shoulder closures with reduced speeds. Passing Lane Construction Road Sections on WYO 59: R.M. 7.1 to 8.6 R.M. 10.1 to 11.4 R.M. 13.7 to 15.2 R.M. 16.3 to 17.5 R.M. 20.2 to 21.9 R.M. 23.1 to 25.1 R.M. 27.0 to 28.5 R.M. 33.1 to 34.7

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY597.1 to 34.7Paved
Reduced speeds up to 10 MPH

Last Updated: 2017-04-02 10:54:27.132

dynamic message sign icon

Wheatland South (I-25 mp 68.97-75.31)

Project Number: NHPPI68.97I252164

WYDOT Contact: Tim Rasnake, phone: 307-322-6500, email: null

Contractor: Mountain Construction Company, Lovell, WY, 307-548-7186

Scheduled Completion Date: 2017-Oct-31

Milling, plant mix, asphalt paving, bridge reclamation and miscellaneous work. Single lane closure, reduced speeds.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I2568.97 to 75.31Paved
Various delay conditions

Last Updated: 2017-04-25 10:20:50.888

dynamic message sign icon

Wilson Idaho State Line (Mail Cabin Slide)

Project Number: STP-200005

WYDOT Contact: Bob Hammond, phone: 307-732-9602, email: null

Scheduled Completion Date: 2018-Jun-30

CM Owen Construction: Grading, drainage, milling plantmix pavement, plantmix wearing course, slide stabilization rock, and miscellaneous work. Expect minor impacts with little or no delay through the summer months.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY2213.2 to 15.0PavedNone

Last Updated: 2017-06-13 15:54:39.954

dynamic message sign icon

Wind River Canyon Landslide

Project Number: STP-DR51575

WYDOT Contact: Kaia Tharp, phone: 307-864-3200, email: null

Scheduled Completion Date: 2017-Jul-14

HL Construction: Grading, draining, placing crushed base and bituminous pavement surfacing, and misc work. Expect 15 minute Stop delays with a 45 mph speed limit through work zones from RM 121 to RM 123. Expect a 30 to 40 minute delay. One way traffic expected with pilot cars. Work zone will vary daily from RM 114 to 126. Completion date has changed to July 14, 2017.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US20117.6 to 126.82Paved
Construction zone speed limit 45 MPH
30 minute delays with stopped conditions

Last Updated: 2017-05-25 16:04:08.217

dynamic message sign icon

Worland - Manderson (Chip Seal Operation)

Project Number: 2

WYDOT Contact: Travis Jorgenson, phone: 272-5505, email: null

Scheduled Completion Date: 2017-Jun-26

Maintenance chip seal operation on HWY 14 between Greybull and Burgess Junction from milepost 19.64 to milepost 26. Flagger operation. Expect 20 minute traffic delays. Operations will begin Thursday June 22, suspend for the weekend, and resume Monday June 26th.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US1419.64 to 26.0Paved
20 minute delays with stopped conditions

Last Updated: 2017-06-20 12:14:07.811

dynamic message sign icon

Worland US16 (Downtown 10th St - 23rd St)

Project Number: B155027

WYDOT Contact: Jordan Erz, phone: null, email: jordan. erz@wyo.gov

Contractor: EHC, LLC, Deaver, WY, 307-664-2558

Scheduled Completion Date: 2017-Oct-31

US16 (Downtown) between 10th St and 23rd St. Traffic delays are minimum to traffic on the highway but there are closed side streets in Worland.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US160.0 to 0.75PavedNone

Last Updated: 2017-04-19 15:01:32.596

dynamic message sign icon

Worland-Ten Sleep, Big Trails Section

Project Number: 2203016

WYDOT Contact: Jordan Erz, phone: null, email: jordan. erz@wyo.gov

Scheduled Completion Date: 2017-Oct-31

Road Work on WYO 434 between mileposts 0.00 and 0.267 and milepost 15.0 to milepost 20.63. Project will have minimum delays to traffic

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY4340.0 to 20.63Paved
Various delay conditions

Last Updated: 2017-06-20 11:59:21.844